Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; plgSystemNiceGoogleAnalytics has a deprecated constructor in D:\Apps\WaterRegister\DSEJoomlaSite_New\plugins\system\nicegoogleanalytics\nicegoogleanalytics.php on line 26 Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; plgSystemRedirect_Failed_Login has a deprecated constructor in D:\Apps\WaterRegister\DSEJoomlaSite_New\plugins\system\redirect_failed_login\redirect_failed_login.php on line 14 Important dates – end of 2024–25 water year application processing - Water Register

The Victorian Water Register, including My Water and the Broker Portal, will close for end-of-year processing at 12 pm 30 June 2025. Services will re-open at 9 am 1 July 2025.

Important information regarding times and dates for the July 2025 trade openings will be provided soon.

If you are trading allocation or water shares before the end of the water year, please be aware of the important dates and times below.

For allocation trades within Victoria:

  • Paper-based applications to trade allocation must be lodged with the water corporation by 5 pm on 20 June 2025. There is no guarantee that applications submitted after this time will be processed in the 2024–25 water year.
  • Online applications to trade allocation—including applications made via the Broker Portal or the Broker API—must be submitted by 12 pm on 30 June 2025 for processing in the 2024–25 water year.

For interstate allocation trade applications that require the approval of both states:

  • Applications for interstate allocation trades submitted online via the Broker Portal or the Broker API must be lodged by 5 pm on 16 June 2025. There is no guarantee that interstate trade applications submitted after this time will be processed in the 2024–25 water year.
  • All interstate allocation trades involving Victoria that are submitted online via the Broker Portal or the Broker API will be processed manually from 5 pm on 26 June 2025.

For water share transfer applications:

  • Applications for water share transfers must be lodged with the water corporation by 5 pm on 16 June 2025. There is no guarantee that applications submitted after this time will be processed in the 2024–25 water year.
  • Please keep in mind the water corporation’s approval of the transfer is only stage one of the water share transfer transaction process. Once approved, both seller(s) and buyer(s) are required to sign the Transfer of Water Share form and submit it to the Water Registrar for recording.
  • Applications to record water share transfers must be lodged with the Water Registrar by 5 pm on 25 June 2025. There is no guarantee that applications submitted after this time will be recorded in the 2024–25 water year. Learn more about lodging with the Water Registrar here.
  • You are reminded that when a water share transfer is recorded, the seller's allocation account will no longer be linked to that water share. Unused water allocation can only be carried over to the next water year if the allocation account is linked to an appropriate water share.